Risk register, issue log and heatmap for one project.
Risk heatmap
Probability (rows) by impact (columns). Choose a cell to filter the register.
54321
12345
Probability / Impact
Mansoor is reviewing the risk register…
Mansoor analysis
Two of the seven risks score 15 or more: late equipment delivery (20) and disruption of live control service during cutover (15). Both trace back to the equipment order and the cutover window. Placing the order before the design is final would ease the first. Review the cutover rehearsal plan first.
Risk register
Risk
Category
Score
Status
Supply
20
Mitigating
Probability
High
Impact
Very high
Mitigation strategy
Order long-lead items before design sign-off. Track the vendor weekly.
Contingency plan
Extend support on the legacy systems for six months.
Operations
15
Mitigating
Probability
Medium
Impact
Very high
Mitigation strategy
Rehearse each step on the test bench. Cut over only between 01:00 and 04:00.
Contingency plan
Rollback to the legacy system within 15 minutes.
People
12
Being analysed
Probability
Medium
Impact
High
Mitigation strategy
Book simulator time now. Make certification a gate for each cutover.
Contingency plan
Delay that cutover by one window.
Technical
12
Monitored
Probability
Medium
Impact
High
Mitigation strategy
Test with recorded live feeds in the factory.
Contingency plan
Use an interface adapter from the vendor.
Financial
6
Monitored
Probability
Low
Impact
Medium
Mitigation strategy
Price the contract in AED where possible.
Contingency plan
Release management reserve.
People
6
Identified
Probability
Low
Impact
Medium
Mitigation strategy
Name a deputy for each key role in the contract.
Contingency plan
Vendor supplies a replacement within 30 days.
Operations
8
Being analysed
Probability
High
Impact
Low
Mitigation strategy
Agree a pass process with security in advance.
Contingency plan
Add night shifts.
Issue
Severity
Status
Critical
In progress
Detail
The backup channel took over both times. Controllers reported 4 minutes of degraded audio.
Mansoor is analysing the issue…
Mansoor suggested solution
Replace the failing power module now, and add this fault to the cutover rationale.
High
Open
Detail
Design sign-off is blocked, which moves factory tests.
Mansoor is analysing the issue…
Mansoor suggested solution
Escalate to the vendor's programme director and agree a dated recovery plan.
Medium
Open
Detail
Training capacity falls by 20% in the next quarter.
Mansoor is analysing the issue…
Mansoor suggested solution
Ask for two replacement trainers from Regional Operations.
Risk heatmap
Probability (rows) by impact (columns). Choose a cell to filter the register.
54321
12345
Probability / Impact
Mansoor is reviewing the risk register…
Mansoor analysis
The register depends on one interface to the airspace authorisation service. Agreeing that interface sets the pace for four of the five risks. Confirm the service owner and a test environment this month.
Risk register
Risk
Category
Score
Status
Technical
16
Mitigating
Probability
High
Impact
High
Mitigation strategy
Agree the interface contract in month 1 and use a mock until then.
Contingency plan
Launch with manual permit checks.
Adoption
12
Being analysed
Probability
Medium
Impact
High
Mitigation strategy
Make registration a condition of every new permit and announce the deadline.
Contingency plan
Extend the grace period by 60 days.
Technical
8
Monitored
Probability
Low
Impact
High
Mitigation strategy
Load test with the provider before launch.
Contingency plan
Queue sign-ups and verify in batches.
Schedule
10
Identified
Probability
Low
Impact
Very high
Mitigation strategy
Release in two stages, with registration first.
Contingency plan
Add a second engineering team for 8 weeks.
Compliance
5
Monitored
Probability
Very low
Impact
Very high
Mitigation strategy
Host in UAE regions only and check this in each release.
Contingency plan
Move data within 14 days.
Issue
Severity
Status
High
In progress
Detail
About 340 of 2,100 records appear twice, which blocks the data migration.
Mansoor is analysing the issue…
Mansoor suggested solution
Match on trade licence number first, then review the remaining pairs by hand.
Medium
Open
Detail
Payment screens cannot be finished without final fees.
Mansoor is analysing the issue…
Mansoor suggested solution
Ask Finance for a decision date and build the screens on configurable fees.